PLATFORM TOWERS PARTS (NEXA/SCHWING)
TOTAL: 16 CONTAINERS
5 FLAT RACKS IN GAUGE
4 FLAT RACKS OUT GAUGE
1 OPEN TOP IN GAUGE
6 CLOSED CONTAINERS
Oil Platform Antenna
(Seatrax)
TOTAL: 5 CONTAINERS
3 PLATFORMS OVER LENGHT
1 FLAT RACK IN GAUGE
1 CLOSED CONTAINER
Others
OVERSIZED BOATS, BURNER TILES, CRANE PARTS, ENGINES,
LABORATORY ROOM, MACHINERY PARTS, TRUCK CONVEYOR
AND PARTS,
Project Services Include
1. Receiving
2. Store
3. Loading/Stuffing
4. Bracing
5. Drayage
Inspection Report on Sight
Reliable Inspection Team provides all necessary documents required by the port.
Loading Team on Sight
Effective team with the right tools to load almost anything on site.
Drayage
Key partners load OOG cargo within 48 hours, once booking is created.